29.08.2016
The project “Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste, ...
more
29.08.2016
The project “Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste, ...
more
29.08.2016
The determination of the flood risk management priorities and objectives for the Black Sea River Basin is conducted within the framework of project №DIR-51211229-1-171 “...
more
29.08.2016
Updating of the policies and elaboration of strategies for the “Bulgarian Energy Holding” and the other organizations from the group, Lot № 2: Elaboration of a ...
more
29.08.2016
Period of implementation: 15.09.2014 - 15.12.2015 Contracting authority: Ministry of Environment and Waters ...
more