09:17
Вторник 01.07.2025

Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste" for Petrich municipality

29.08.2016 The project “Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste, ...  more

Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste" for Berkovitsa municipality

29.08.2016 The project “Preparation of project proposal for “Design and construction of composting installation for separately collected green and/or biodegradable waste, ...  more

Determining the flood risk management priorities and objectives for the Black Sea River Basin

29.08.2016 The determination of the flood risk management priorities and objectives for the Black Sea River Basin is conducted within the framework of project №DIR-51211229-1-171 “...  more

Updating of the policies and elaboration of strategies for the “Bulgarian Energy Holding” and the other organizations from the group

29.08.2016 Updating of the policies and elaboration of strategies for the “Bulgarian Energy Holding” and the other organizations from the group, Lot № 2: Elaboration of a ...  more

Economic Analysis of Water us for the period 2008-2012 and Projections to 2021

29.08.2016 Period of implementation: 15.09.2014 - 15.12.2015 Contracting authority: Ministry of Environment and Waters ...  more